![]() |
|
|||||||
| H E A D L I N E S |
| Transportation Newswire Read the Transportation Newswire by LISTSERV or RSS State Highway Administration Twitter Feed Metro Twitter Feed |
![]() |
|
|
Thread Tools | Search this Thread | Display Modes |
|
#1
|
|||
|
|||
|
Resurfacing of Portions of Muddy Branch Road and Blueridge Avenue to Begin in June The Division of Highway Services will begin repairing and then resurfacing Muddy Branch Road between Diamondback Drive and Darnestown Road/MD28 in early June, weather permitting. Similarly, Blueridge Avenue between Geaorgia Avenue/MD97 and Amherst Avenue will also be resurfaced starting about the same time. This work is occuring under Highway's system preservation project that employs long term strategies to preserve and enhance the condition of the county's roadways. This work will typically entail... * Surveying the roadway for needed repairs * Full depth patching work * Making utility adjustments * Crack sealing * Pavement milling in the case of Blueridge * Paving with hot mix asphalt on Blueridge and with micro pave on Muddy Branch. * Restriping This work should last about two weeks on Muddy Branch Road and about four weeks on Blueridge Aven ...more |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Section | Replies | Latest Article |
| Resurfacing of Portions of Caroll Avenue to Begin in Mid-May | News Hound | Transportation Newswire | 0 | 05-14-2010 06:01 PM |
| Resurfacing of Portions of Tuckerman Lane to Begin in May | News Hound | Transportation Newswire | 0 | 04-27-2010 10:40 AM |
| Resurfacing of Carroll Avenue to Begin November 9 | Howard Hartman | Transportation Newswire | 0 | 11-05-2009 03:24 PM |
| SHA to Begin Resurfacing Along MD 193 Between Veirs Mill Road and Arcola Avenue | Howard Hartman | Transportation Newswire | 0 | 06-30-2009 03:34 PM |